F-MAX-USER MANUAL-FULL BOOK-ENGLISH
AUXILIARY HEATER
Airtronic/Airtronic M
Mounting and fastening Make the necessary breakthroughs for exhaust, combustion air and fuel as shown in the hole diagram. The support surface for the heater foot must be at. An appropriate tool can be purchased from the manufacturer for drilling the breakthroughs and also smoothing the support surface. The hole Ø 10.5 mm for the cable harness “dosing pump” is not included in the picture drawing and must be drilled after
If the sheet metal of the support surface is <1.5 mm thick, an additional reinforcement must be installed.
Order no: reinforcement plate Order no: special tool
20 1577 89 00 03
99 1201 46 53 29
Special tool
installation. Picture hole
1 Contour of the bearing surface
- 258 -
Made with FlippingBook - Online magazine maker